Interesting - why do you need this? The calculation logic asks for specific products from specific processes; you can indeed have the same product (e.g. steel) multiple times in the input (from different production routes, e.g., but it is the same product) but you will not need the same product multiple times as output. Curious to hear your explanation, best wishes, Andreas