0 votes
1.2k views
in openLCA by (120 points)

1 Answer

0 votes
by (126k points)
Hi, good question:

- if it is a waste flow, then as input (this is what I would recommend); processes creating waste have this flow then as output;

- if it is a product flow (ecoinvent / SimaPro way of modeling) you need to put it as output, with a negative sign, and those processes who create waste need to have this flow as input, with a negative sign. Be aware to really put a negative sign twice, otherwise you get negative results.
by (100 points)
Hello, perhaps this is obvious, but I've been struggling with this for a while now. How can I create a process with a waste flow as the reference flow?
...