Hi,
May I know where to put the electricity for recovery energy for waste treatment, as an example, the Net electricity output for pyrolysis is 600kWh? and which electricity flows do I have to use? Is it the same electricity for process consumptions (e.g. electricity, high voltage)?
I'm using a secondary data from previous study: Life cycle assessment of pyrolysis, gasification and incineration waste-to-energy technologies: Theoretical analysis and case study of commercial plants, https://doi.org/10.1016/j.scitotenv.2018.01.151. You can find it from the supplementary data provided by this article. I can't find the dataset of pyrolysis process for hazardous waste and I have to key in the data into the openLCA.
Thanks